Consentimiento Informado de Servicio Técnico y Mantenimiento Water Quality Diagnosis and Preventive Follow-Up Plan Fecha DD dash MM dash YYYY Clientes Asunto: 1. Background and Technical DiagnosisIt is hereby stated that, following the technical inspection carried out at the clients’ residence, it was determined that the water supply presents a critical condition of dissolved sediments. It is important to record that the piping and hydraulic installations of the property already had issues and obstructions prior to the installation of the new treatment system. Therefore, the current system will operate under higher-than-normal hydraulic stress conditions.2. Mandatory Follow-Up PlanDue to the high concentration of sediments, the optimal operation of the equipment strictly depends on a preventive maintenance program. The following terms are agreed upon: Frequency: Follow-up visits and technical cleaning will be carried out every 3 to 6 months. Plan Duration: This intensive monitoring plan will remain in effect for 2 years from the date of this document.3. Statement of Consent By signing this document, the clients declare that: By signing this document: declare that: They have been informed about the previous condition of their pipes and the quality of the incoming water. They understand that failure to comply with the maintenance schedule (every 3–6 months) may result in irreparable damage to the system or a reduction in its lifespan, which would void any warranties due to misuse or lack of proper care. They release the installing technician from liability for failures caused by sediment saturation if maintenance is not performed within the stipulated timeframes. Signatures of Agreement Client: (Required)(Required)Client: (Required)Client:Client: Technician/Installer:(Required)Technician/Installer: Δ